Home / Insights / Sourcing / Chinese New Year and Summer Peaks: Planning Around Our Calendar
Sourcing

Chinese New Year and Summer Peaks: Planning Around Our Calendar

H
BAITU PACKAGING Team
Technical · Blow molding
·Published 2026-09-14·6 min read·13 views

Every sourcing discussion starts with unit price. Very few start with the calendar, which is strange, because a missed delivery costs far more than a few cents per bottle. In China, packaging capacity is not evenly distributed across the year. There are four windows when it tightens sharply — and all four are predictable years in advance.

Window 1: Chinese New Year

This is the big one, and it is larger than the official holiday suggests. The statutory break is around eight days. The actual disruption runs five to six weeks.

PhaseWhat happensCapacity
4–6 weeks beforeBrands rush to ship before the break. Every plant books out; raw material lead times stretch.Overbooked — new orders get pushed past the holiday
2 weeks beforeMigrant workers begin leaving for home. Lines run short-staffed, then stop.Falling fast
Holiday weekPlant closed. Only security and maintenance on site.Zero
1–2 weeks afterWorkers return gradually. Plants restart with a backlog already queued.Slow ramp, allocated to oldest orders

Upcoming dates to work from:

YearChinese New YearPractical order-by date
20276 FebruaryEarly December 2026
202826 JanuaryMid-November 2027

Note that 2028 is almost two weeks earlier than 2027. If you plan your year by "last year we ordered in December", the 2028 cycle will catch you out.

Window 2: Summer Power Curbs

Guangdong summers push the grid to its limit, and provincial policy occasionally restricts industrial electricity use. Blow moulding is energy-intensive — extruders and chillers run continuously — so a curb hits our output directly.

In practice this shows up as scheduled downtime rather than a full stop, and it is usually announced with little notice. Orders placed for July and August delivery should carry a buffer of two to three weeks.

Window 3: Typhoon Season

Shantou sits on the South China coast. Typhoon season runs roughly July to September. Ports in the region — Shantou, Shenzhen, Xiamen — close for one to three days during a direct hit, and vessel schedules take about a week to recover.

Direct production risk is modest: we batten down and lose a day or two. The risk that matters is at the port, and it is entirely outside anyone's control. Build a week of slack into any shipment booked between July and September.

Window 4: The Post-Holiday Rebound

The weeks immediately after Chinese New Year are the least intuitive bottleneck of the year. Plants are open, workers are back, and it still takes longer than you expect — because every order that was deferred in the previous six weeks now arrives at once. February and March are often the hardest months to get a new mould started.

If your project involves a new tool, start it before the holiday, not after.

The Order-By Calendar, Condensed

If you need deliveryPlace the orderReason
Before Chinese New Year (Jan–Feb)8–10 weeks aheadPre-holiday shipping crunch
March–AprilBefore the holiday, if possiblePost-holiday order pile-up
May–JuneNormal lead timeThe easiest window of the year
July–SeptemberAdd 2–3 weeks bufferPower curbs and typhoon season
October–DecemberAdd 1–2 weeks bufferPre-holiday congestion building
The one habit that solves most of this: place your annual volume in one conversation. If we know in March that you will need 200,000 units across the year, we can reserve line time, pre-order resin and hold your mould ready. Brands that forecast get served first in a tight month — not because we play favourites, but because their orders are the ones that can actually be scheduled.

What We Cannot Fix

Being honest about the boundaries is more useful than promising the impossible.

  • We cannot compress Chinese New Year. Two hundred million people travel. No plant in China stays open through it.
  • We cannot stop a typhoon. We can pre-book earlier sailings and stage goods at the port, and we do.
  • We cannot conjure resin. If a resin grade goes short globally, as PCR grades periodically do, everyone waits. The buffer you build into your own planning is the only real protection.

A Practical Rhythm

Most of our long-standing customers settle into an annual pattern without ever writing it down:

  • March–April: place the year's main order, including any new mould project.
  • May–June: take the bulk of the volume; this is the year's cheapest and fastest window.
  • July–August: move to safety stock; keep new projects off the calendar.
  • September–October: second production run, ahead of the holiday squeeze.
  • November–December: only top-ups and urgent repeats. Nothing new.

It is not glamorous, and it is the difference between a supply chain that runs and one that surprises you twice a year.

Still deciding? Send us your formula and target price.

We will recommend resin, gram weight and neck finish, and quote unit price + mold cost within 24 hours.

Share:WhatsAppLinkedInFacebookTags: lead time, Chinese New Year, capacity planning, typhoon season, power rationing
Contents
Window 1: Chinese New YearWindow 2: Summer Power CurbsWindow 3: Typhoon SeasonWindow 4: The Post-Holiday ReboundThe Order-By Calendar, CondensedWhat We Cannot FixA Practical Rhythm
Talk to an engineerEmail UsSend RFQ

Reply within 2h · GMT+8 08:30–18:00
Free samples for stock items

TOP