Shantou, Guangdong · China's Cosmetic Packaging HubFactory direct · No middlemanMOQ from 10,000 pcs · Samples in 3–7 days
Free samples||WhatsApp +86 156 2555 3187
Home / Insights / Sourcing / How to Read a Bottle Quotation: What Is Included and What Is Not
Sourcing

How to Read a Bottle Quotation: What Is Included and What Is Not

H
BAITU PACKAGING Team
Technical · Blow molding
·Published 2026-09-14·7 min read·6 views

A quotation that says "$0.42 per bottle, MOQ 10,000" is not a quotation. It is a starting position. By the time the order lands, the number that matters is the landed cost per finished, decorated, packed bottle on your warehouse floor — and that number is assembled from about eleven separate lines.

The Eleven Lines a Quotation Should Have

LineWhat to check
Bottle unit price by quantity tierTiers should be stated at real breakpoints, with the price at MOQ and at least two tiers above.
Mould or tooling costOne-off. Ask whether it is reusable and whether it covers spare cavities.
Sample and courier costWhether pre-production samples are free, and who pays the freight.
Closures, pumps and insertsPriced separately or included? This is the single most common gap.
DecorationPer colour, per pass, per side. Screen printing is usually priced per colour; hot stamping per area.
Plate or screen chargesOne-off per colour, or charged again on every repeat order.
Export packingPoly bags, dividers, cartons, pallets, stretch film — and whether pallets meet ISPM 15.
Price basisTax inclusive or exclusive, currency, and the exchange rate date.
Trade termEXW, FOB, CIF or DDP — and for FOB, the named port, which is usually missing.
MOQ and below-MOQ surchargeThe MOQ is often stated; the surcharge for going under it usually is not.
Validity and price adjustmentHow long the price holds, and what happens if resin moves.

Why the Cheaper Quote Usually Is Not

Take two quotes for a 500 ml HDPE shampoo bottle with a pump and one-colour screen print, 20,000 units:

ItemQuote AQuote B
Bottle$0.40$0.44
PumpNot includedIncluded
Screen charge$90 per order$120 one-off
Poly bag + cartonExtra, $180Included
PalletBuyer suppliesIncluded, ISPM 15
TermFOBFOB Shantou
Effective per unit~$0.49 + buyer-supplied pallets~$0.45

Quote A is 9% more expensive once the missing lines are priced in, and it still leaves you responsible for sourcing pallets. This is not usually dishonesty — suppliers quote what they habitually quote — but it means unit price alone tells you almost nothing.

Ask for the unit price split into four parts: bottle, closure, decoration, packing. A supplier who can do that has a real cost model. One who cannot is quoting from memory, and the number will move once you place the order.

The Six Omissions That Cost the Most

  • Closures quoted separately. A bottle price with no pump, cap or insert is not comparable to one with them. Price the closure at the volume you will actually buy, not at sample quantity.
  • "FOB" without a port. FOB Shanghai and FOB Shantou are different freight costs. Without a named port the term means nothing.
  • No exchange rate clause. If you are quoted in USD and pay in RMB, a 4% currency move is 4% of your margin. Ask which rate and which date the price is based on.
  • One-way resin adjustment. Some suppliers reserve the right to raise the price if resin rises, without lowering it if resin falls. A symmetric clause is fair; a one-sided one is not.
  • Packing not specified. "Standard export packing" can mean anything from 50 to 200 units per carton, which changes both freight volume and the damage rate.
  • Inspection excluded. Who pays for third-party inspection, and is a failed inspection grounds for rework at the supplier's cost?
Tooling is the line where leverage is highest and scrutiny is lowest. Confirm three things in writing: whether the mould is exclusive to you or shared across customers, what the cavity count is, and who owns the mould and what happens to it if you transfer production. A shared mould is cheaper and produces inconsistent colour and fit between batches.

How to Normalise Two Quotes

  1. Convert both to the same trade term. Add freight and insurance to EXW prices so everything is compared at CIF or DDP.
  2. Add the closure to any quote that excludes it, at your real volume.
  3. Add decoration and one-off charges amortised over your actual order quantity.
  4. Add packing and palletisation where they are excluded.
  5. Divide by the number of good bottles, not the number ordered — a 2% breakage difference is a 2% price difference.

What to Put in the Purchase Order

  • The agreed price basis, currency and exchange rate date.
  • The named port or delivery point.
  • Packing specification with carton quantities and pallet configuration.
  • Payment terms with the trigger for each instalment.
  • Lead time, and what event starts the clock — deposit received, or sample approved.
  • The acceptance criteria and the remedy if they are not met.

The Short Version

Read a quotation by rebuilding it. Bottle, closure, decoration, packing, tooling, freight, currency — seven components that add up to one landed cost. The supplier who shows you all seven is not necessarily cheaper, but they are the one whose number will still be the same at the end of the order.

Still deciding? Send us your formula and target price.

We will recommend resin, gram weight and neck finish, and quote unit price + mold cost within 24 hours.

Share:WhatsAppLinkedInFacebookTags: quotation, pricing, FOB, Incoterms, tooling, MOQ, cost breakdown
Contents
The Eleven Lines a Quotation Should HaveWhy the Cheaper Quote Usually Is NotThe Six Omissions That Cost the MostHow to Normalise Two QuotesWhat to Put in the Purchase OrderThe Short Version
Talk to an engineerEmail UsSend RFQ

Reply within 2h · GMT+8 08:30–18:00
Free samples for stock items

TOP